1997-12-04 10:41:49 +00:00
|
|
|
/*-
|
|
|
|
* Copyright (c) 1997 Wolfgang Helbig
|
|
|
|
* All rights reserved.
|
|
|
|
*
|
|
|
|
* Redistribution and use in source and binary forms, with or without
|
|
|
|
* modification, are permitted provided that the following conditions
|
|
|
|
* are met:
|
|
|
|
* 1. Redistributions of source code must retain the above copyright
|
|
|
|
* notice, this list of conditions and the following disclaimer.
|
|
|
|
* 2. Redistributions in binary form must reproduce the above copyright
|
|
|
|
* notice, this list of conditions and the following disclaimer in the
|
|
|
|
* documentation and/or other materials provided with the distribution.
|
|
|
|
*
|
|
|
|
* THIS SOFTWARE IS PROVIDED BY THE AUTHOR AND CONTRIBUTORS ``AS IS'' AND
|
|
|
|
* ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE
|
|
|
|
* IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
|
|
|
|
* ARE DISCLAIMED. IN NO EVENT SHALL THE AUTHOR OR CONTRIBUTORS BE LIABLE
|
|
|
|
* FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL
|
|
|
|
* DAMAGES (INCLUDING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS
|
|
|
|
* OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION)
|
|
|
|
* HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT
|
|
|
|
* LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY
|
|
|
|
* OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF
|
|
|
|
* SUCH DAMAGE.
|
|
|
|
*
|
1999-08-28 00:22:10 +00:00
|
|
|
* $FreeBSD$
|
1997-12-04 10:41:49 +00:00
|
|
|
*/
|
|
|
|
|
|
|
|
#include "calendar.h"
|
|
|
|
|
|
|
|
#ifndef NULL
|
|
|
|
#define NULL 0
|
|
|
|
#endif
|
|
|
|
|
|
|
|
/*
|
|
|
|
* For each month tabulate the number of days elapsed in a year before the
|
|
|
|
* month. This assumes the internal date representation, where a year
|
|
|
|
* starts on March 1st. So we don't need a special table for leap years.
|
|
|
|
* But we do need a special table for the year 1582, since 10 days are
|
|
|
|
* deleted in October. This is month1s for the switch from Julian to
|
|
|
|
* Gregorian calendar.
|
|
|
|
*/
|
|
|
|
static int const month1[] =
|
|
|
|
{0, 31, 61, 92, 122, 153, 184, 214, 245, 275, 306, 337};
|
|
|
|
/* M A M J J A S O N D J */
|
|
|
|
static int const month1s[]=
|
|
|
|
{0, 31, 61, 92, 122, 153, 184, 214, 235, 265, 296, 327};
|
|
|
|
|
1997-12-13 11:51:16 +00:00
|
|
|
typedef struct date date;
|
|
|
|
|
1997-12-04 10:41:49 +00:00
|
|
|
/* The last day of Julian calendar, in internal and ndays representation */
|
|
|
|
static int nswitch; /* The last day of Julian calendar */
|
|
|
|
static date jiswitch = {1582, 7, 3};
|
|
|
|
|
|
|
|
static date *date2idt(date *idt, date *dt);
|
|
|
|
static date *idt2date(date *dt, date *idt);
|
|
|
|
static int ndaysji(date *idt);
|
|
|
|
static int ndaysgi(date *idt);
|
|
|
|
static int firstweek(int year);
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Compute the Julian date from the number of days elapsed since
|
|
|
|
* March 1st of year zero.
|
|
|
|
*/
|
|
|
|
date *
|
|
|
|
jdate(int ndays, date *dt)
|
|
|
|
{
|
|
|
|
date idt; /* Internal date representation */
|
|
|
|
int r; /* hold the rest of days */
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Compute the year by starting with an approximation not smaller
|
|
|
|
* than the answer and using linear search for the greatest
|
|
|
|
* year which does not begin after ndays.
|
|
|
|
*/
|
|
|
|
idt.y = ndays / 365;
|
|
|
|
idt.m = 0;
|
|
|
|
idt.d = 0;
|
|
|
|
while ((r = ndaysji(&idt)) > ndays)
|
|
|
|
idt.y--;
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Set r to the days left in the year and compute the month by
|
|
|
|
* linear search as the largest month that does not begin after r
|
|
|
|
* days.
|
|
|
|
*/
|
|
|
|
r = ndays - r;
|
|
|
|
for (idt.m = 11; month1[idt.m] > r; idt.m--)
|
|
|
|
;
|
|
|
|
|
|
|
|
/* Compute the days left in the month */
|
|
|
|
idt.d = r - month1[idt.m];
|
|
|
|
|
|
|
|
/* return external representation of the date */
|
|
|
|
return (idt2date(dt, &idt));
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Return the number of days since March 1st of the year zero.
|
|
|
|
* The date is given according to Julian calendar.
|
|
|
|
*/
|
|
|
|
int
|
|
|
|
ndaysj(date *dt)
|
|
|
|
{
|
|
|
|
date idt; /* Internal date representation */
|
|
|
|
|
|
|
|
if (date2idt(&idt, dt) == NULL)
|
|
|
|
return (-1);
|
|
|
|
else
|
|
|
|
return (ndaysji(&idt));
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Same as above, where the Julian date is given in internal notation.
|
|
|
|
* This formula shows the beauty of this notation.
|
|
|
|
*/
|
|
|
|
static int
|
|
|
|
ndaysji(date * idt)
|
|
|
|
{
|
|
|
|
|
|
|
|
return (idt->d + month1[idt->m] + idt->y * 365 + idt->y / 4);
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Compute the date according to the Gregorian calendar from the number of
|
|
|
|
* days since March 1st, year zero. The date computed will be Julian if it
|
|
|
|
* is older than 1582-10-05. This is the reverse of the function ndaysg().
|
|
|
|
*/
|
|
|
|
date *
|
|
|
|
gdate(int ndays, date *dt)
|
|
|
|
{
|
|
|
|
int const *montht; /* month-table */
|
|
|
|
date idt; /* for internal date representation */
|
|
|
|
int r; /* holds the rest of days */
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Compute the year by starting with an approximation not smaller
|
|
|
|
* than the answer and search linearly for the greatest year not
|
|
|
|
* starting after ndays.
|
|
|
|
*/
|
|
|
|
idt.y = ndays / 365;
|
|
|
|
idt.m = 0;
|
|
|
|
idt.d = 0;
|
|
|
|
while ((r = ndaysgi(&idt)) > ndays)
|
|
|
|
idt.y--;
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Set ndays to the number of days left and compute by linear
|
|
|
|
* search the greatest month which does not start after ndays. We
|
|
|
|
* use the table month1 which provides for each month the number
|
|
|
|
* of days that elapsed in the year before that month. Here the
|
|
|
|
* year 1582 is special, as 10 days are left out in October to
|
|
|
|
* resynchronize the calendar with the earth's orbit. October 4th
|
|
|
|
* 1582 is followed by October 15th 1582. We use the "switch"
|
|
|
|
* table month1s for this year.
|
|
|
|
*/
|
|
|
|
ndays = ndays - r;
|
|
|
|
if (idt.y == 1582)
|
|
|
|
montht = month1s;
|
|
|
|
else
|
|
|
|
montht = month1;
|
|
|
|
|
|
|
|
for (idt.m = 11; montht[idt.m] > ndays; idt.m--)
|
|
|
|
;
|
|
|
|
|
|
|
|
idt.d = ndays - montht[idt.m]; /* the rest is the day in month */
|
|
|
|
|
|
|
|
/* Advance ten days deleted from October if after switch in Oct 1582 */
|
|
|
|
if (idt.y == jiswitch.y && idt.m == jiswitch.m && jiswitch.d < idt.d)
|
|
|
|
idt.d += 10;
|
|
|
|
|
|
|
|
/* return external representation of found date */
|
|
|
|
return (idt2date(dt, &idt));
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Return the number of days since March 1st of the year zero. The date is
|
|
|
|
* assumed Gregorian if younger than 1582-10-04 and Julian otherwise. This
|
|
|
|
* is the reverse of gdate.
|
|
|
|
*/
|
|
|
|
int
|
|
|
|
ndaysg(date *dt)
|
|
|
|
{
|
|
|
|
date idt; /* Internal date representation */
|
|
|
|
|
|
|
|
if (date2idt(&idt, dt) == NULL)
|
|
|
|
return (-1);
|
|
|
|
return (ndaysgi(&idt));
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Same as above, but with the Gregorian date given in internal
|
|
|
|
* representation.
|
|
|
|
*/
|
|
|
|
static int
|
|
|
|
ndaysgi(date *idt)
|
|
|
|
{
|
|
|
|
int nd; /* Number of days--return value */
|
|
|
|
|
|
|
|
/* Cache nswitch if not already done */
|
|
|
|
if (nswitch == 0)
|
|
|
|
nswitch = ndaysji(&jiswitch);
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Assume Julian calendar and adapt to Gregorian if necessary, i. e.
|
|
|
|
* younger than nswitch. Gregori deleted
|
|
|
|
* the ten days from Oct 5th to Oct 14th 1582.
|
|
|
|
* Thereafter years which are multiples of 100 and not multiples
|
|
|
|
* of 400 were not leap years anymore.
|
|
|
|
* This makes the average length of a year
|
|
|
|
* 365d +.25d - .01d + .0025d = 365.2425d. But the tropical
|
|
|
|
* year measures 365.2422d. So in 10000/3 years we are
|
|
|
|
* again one day ahead of the earth. Sigh :-)
|
|
|
|
* (d is the average length of a day and tropical year is the
|
|
|
|
* time from one spring point to the next.)
|
|
|
|
*/
|
|
|
|
if ((nd = ndaysji(idt)) == -1)
|
|
|
|
return (-1);
|
|
|
|
if (idt->y >= 1600)
|
|
|
|
nd = (nd - 10 - (idt->y - 1600) / 100 + (idt->y - 1600) / 400);
|
|
|
|
else if (nd > nswitch)
|
|
|
|
nd -= 10;
|
|
|
|
return (nd);
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Compute the week number from the number of days since March 1st year 0.
|
|
|
|
* The weeks are numbered per year starting with 1. If the first
|
|
|
|
* week of a year includes at least four days of that year it is week 1,
|
|
|
|
* otherwise it gets the number of the last week of the previous year.
|
|
|
|
* The variable y will be filled with the year that contains the greater
|
|
|
|
* part of the week.
|
|
|
|
*/
|
|
|
|
int
|
|
|
|
week(int nd, int *y)
|
|
|
|
{
|
|
|
|
date dt;
|
|
|
|
int fw; /* 1st day of week 1 of previous, this and
|
|
|
|
* next year */
|
|
|
|
gdate(nd, &dt);
|
|
|
|
for (*y = dt.y + 1; nd < (fw = firstweek(*y)); (*y)--)
|
|
|
|
;
|
|
|
|
return ((nd - fw) / 7 + 1);
|
|
|
|
}
|
|
|
|
|
|
|
|
/* return the first day of week 1 of year y */
|
|
|
|
static int
|
|
|
|
firstweek(int y)
|
|
|
|
{
|
|
|
|
date idt;
|
|
|
|
int nd, wd;
|
|
|
|
|
|
|
|
idt.y = y - 1; /* internal representation of y-1-1 */
|
|
|
|
idt.m = 10;
|
|
|
|
idt.d = 0;
|
|
|
|
|
|
|
|
nd = ndaysgi(&idt);
|
|
|
|
/*
|
|
|
|
* If more than 3 days of this week are in the preceding year, the
|
|
|
|
* next week is week 1 (and the next monday is the answer),
|
|
|
|
* otherwise this week is week 1 and the last monday is the
|
|
|
|
* answer.
|
|
|
|
*/
|
|
|
|
if ((wd = weekday(nd)) > 3)
|
|
|
|
return (nd - wd + 7);
|
|
|
|
else
|
|
|
|
return (nd - wd);
|
|
|
|
}
|
|
|
|
|
|
|
|
/* return the weekday (Mo = 0 .. Su = 6) */
|
|
|
|
int
|
|
|
|
weekday(int nd)
|
|
|
|
{
|
|
|
|
date dmondaygi = {1997, 8, 16}; /* Internal repr. of 1997-11-17 */
|
|
|
|
static int nmonday; /* ... which is a monday */
|
|
|
|
|
|
|
|
/* Cache the daynumber of one monday */
|
|
|
|
if (nmonday == 0)
|
|
|
|
nmonday = ndaysgi(&dmondaygi);
|
|
|
|
|
|
|
|
/* return (nd - nmonday) modulo 7 which is the weekday */
|
|
|
|
nd = (nd - nmonday) % 7;
|
|
|
|
if (nd < 0)
|
|
|
|
return (nd + 7);
|
|
|
|
else
|
|
|
|
return (nd);
|
|
|
|
}
|
|
|
|
|
|
|
|
/*
|
|
|
|
* Convert a date to internal date representation: The year starts on
|
|
|
|
* March 1st, month and day numbering start at zero. E. g. March 1st of
|
|
|
|
* year zero is written as y=0, m=0, d=0.
|
|
|
|
*/
|
|
|
|
static date *
|
|
|
|
date2idt(date *idt, date *dt)
|
|
|
|
{
|
|
|
|
|
|
|
|
idt->d = dt->d - 1;
|
|
|
|
if (dt->m > 2) {
|
|
|
|
idt->m = dt->m - 3;
|
|
|
|
idt->y = dt->y;
|
|
|
|
} else {
|
|
|
|
idt->m = dt->m + 9;
|
|
|
|
idt->y = dt->y - 1;
|
|
|
|
}
|
|
|
|
if (idt->m < 0 || idt->m > 11 || idt->y < 0)
|
|
|
|
return (NULL);
|
|
|
|
else
|
|
|
|
return idt;
|
|
|
|
}
|
|
|
|
|
|
|
|
/* Reverse of date2idt */
|
|
|
|
static date *
|
|
|
|
idt2date(date *dt, date *idt)
|
|
|
|
{
|
|
|
|
|
|
|
|
dt->d = idt->d + 1;
|
|
|
|
if (idt->m < 10) {
|
|
|
|
dt->m = idt->m + 3;
|
|
|
|
dt->y = idt->y;
|
|
|
|
} else {
|
|
|
|
dt->m = idt->m - 9;
|
|
|
|
dt->y = idt->y + 1;
|
|
|
|
}
|
|
|
|
if (dt->m < 1)
|
|
|
|
return (NULL);
|
|
|
|
else
|
|
|
|
return (dt);
|
|
|
|
}
|