dhclient and pccard_ether, introduce the concept of a "settle time" to
pccard_ether with the new pccard_ether_delay variable. Defaults to 5
seconds, which is enough time for the ed driver to finish its
autoconfiguration for newer Linksys based cards. This also can
eliminate the ed0: timeout messages that happen at startup as well.
MFC: after RE says OK.
discussed on the arch@ mailinglist (after repo-copy).
sys.mk will .error if it finds /etc/defaults/make.conf but include
it anyways (this is the same behaviour as with the make.conf.local
removal).
/usr/share/examples/etc/make.conf has BDEFLAGS commented out now,
since it's only an example file.
Adjust all textes that talk about make.conf or defaults/make.conf to
match the new situation.
.Op. None of the other manual pages do it when discussing options in
the main text, so this one shouldn't, either. Also, use .Pq instead
of another odd constructhyphenation isn't an issue here, since it's
desireable to have the contents of that digression appear together,
and it's already in another macro, anyway).
which were introduced 5 months ago. Looking at the descriptions,
these two look like the stupidest options to have arrived in a while,
but they must be documented now that they've been merged onto the
stable branch.
value, it forces GCC to not optimize above this level. For intance, GCC
made with "WANT_FORCE_OPTIMIZATION_DOWNGRADE=1" is a good setting for the
Alpha platform when building ports.
Avoid using parenthesis enclosure macros (.Pq and .Po/.Pc) with plain text.
Not only this slows down the mdoc(7) processing significantly, but it also
has an undesired (in this case) effect of disabling hyphenation within the
entire enclosed block.
building a .cf file from a .mc file.
Include -D_FFR_TLS_O_T to enable tls policy control since the sendmail binary
build enables that FFR as well.
PR: conf/28361
MFC after: 1 week
for separating the startup scripts' list into individual filenames.
Run the shutdown scripts in reverse alphabetical order, so dependent
services are stopped before the services they depend upon.
Reviewed by: -arch, -audit
MFC after: 3 weeks