_get_thread_load() is function used to determine
the load of a thread based on relation of busy/idle tsc
from previous scheduling period.
In order to avoid division by 0 calculating the percentage,
we can simply exit early determining that thread was not
doing any work.
Having this check here will make sure that no matter
the changes in event framework, scheduler dynamic will work.
Removed the place that updated last_stats if they weren't
yet updated at least once (first scheduling period iteration).
In this case after change to _get_thread_load() will be the same,
as only the latest iteration will be used to calculate thread load.
Signed-off-by: Tomasz Zawadzki <tomasz.zawadzki@intel.com>
Change-Id: I75f0f12f024675f2473a26e30596d6eb28093d46
Reviewed-on: https://review.spdk.io/gerrit/c/spdk/spdk/+/7917
Tested-by: SPDK CI Jenkins <sys_sgci@intel.com>
Community-CI: Mellanox Build Bot
Reviewed-by: Shuhei Matsumoto <shuhei.matsumoto.xt@hitachi.com>
Reviewed-by: Ben Walker <benjamin.walker@intel.com>
Reviewed-by: Konrad Sztyber <konrad.sztyber@intel.com>